Common Mistakes To Avoid When Preparing For Your Liquid Screed
Measuring the space incorrectly
Often sub-floor slope or unevenness may cause unexpected differences in the overall floor level and in the quantity of screed required. It is the customer’s responsibility to measure each room/area appropriately.
You will need to consider critical features such as door openings, minimum thicknesses/cover and required differentials in floor height between rooms. It is very important that you must ensure your sub-base is adequate to take the additional weight of the screed, as this is not our responsibility.
Prior to installation, the required depth must be marked on the wall above the level of the finished screed, so that they are present for comparison should a disagreement be raised about finished floor levels.
Any such disagreement must be brought to our attention within 48 hours of the screed being laid. Should these marks be removed or altered prior to any investigations then we will not be held accountable for any level issues.
Ordering less screed than required